- Home
- Departments
- Community Development
- Planning
- Environmental Documents
Environmental Documents
NEWLAND KIRBY PROJECT (CUP22-002)
- Addendum to the Hemet General Plan 2030 EIR (pdf)
- Mitigation Monitoring and Reporting Program (pdf)
- Appendix A - Air Quality, Health Risk, Greenhouse Gas and Energy Impact Report (pdf)
- Appendix B - General Biological Assessment and MSHCP Consistency Analysis (pdf)
- Appendix C - Cultural Resources Study (pdf)
- Appendix D - Paleontological Assessment (pdf)
- Appendix E - Geotechnical Engineering Report (pdf)
- Appendix F - Phase I Environmental Site Assessment (pdf)
- Appendix G - Project Specific WQMP (pdf)
- Appendix H - Preliminary Hydrology and Hydraulics Study (pdf)
- Appendix I - Noise and Vibration Impact Analysis (pdf)
- Appendix J - Water Supply Assessment Report (pdf)
- Appendix K - Traffic Impact Analysis Report (pdf)
- Appendix L - Vehicle Miles Traveled Screening Memo (pdf)
- Appendix M - GPA TIA (pdf)
JD FIELDS PIPE FACILITY (SDR21-021)
- Notice of Intent (pdf)
- Notice of Completion (pdf)
- Draft Mitigation Monitoring and Reporting Program (pdf)
- Draft Initial Study and Mitigated Negative Declaration (pdf)
- Appendix A - Air Quality Assessment (pdf)
- Appendix B - Biological Resource Assessment (pdf)
- Appendix C1 - Cultural Resources Assessment (pdf)
- Appendix C2 - Tribal Consultation (pdf)
- Appendix D - Geotechnical Report (pdf)
- Appendix E - Greenhouse Gas Emissions (pdf)
- Appendix F - Phase I Environmental Site Assessment (pdf)
- Appendix G - Preliminary Hydrology Report (pdf)
- Appendix H - Preliminary Water Quality Management Plan (pdf)
- Appendix I - Noise Report (pdf)
- Appendix J - Trip Generation and VMT Screening Memorandum (pdf)
GIRARD SUBDIVISION (TTM37558, MAP20-002, ZC20-001)
- Notice of Availability (pdf)
- Draft Initial Study and Mitigated Negative Declaration (pdf)
- Appx-A---AQ-Model-Data-Outputs---Daily-Emissions (pdf)
- Appx-B---Biological-Technical-Report (pdf)
- Appx-C---Aquatic-Resources-Delineation (pdf)
- Appx-D---Updated-Preliminary-Geotechnical-Investigation-Report (pdf)
- Appx-E---Supplemental-Geologic-Fault-Hazard-Study (pdf)
- Appx-F---Paleo-Record-Search-Results (pdf)
- Appx-G---AQ-Model-Data-Outputs---Annual-Emissions (pdf)
- Appx-H---Phase-I-Environmental-Site-Assessment (pdf)
- Appx-I---Preliminary-Infiltration-Testing-Investigation (pdf)
- Appx-J---Preliminary-Drainage-Report (pdf)
- Appx-K---Preliminary-Water-Quality-Management-Plan (pdf)
- Appx-L---Baseline-Noise-Measurements (pdf)
- Appx-M---Traffic-Impact-Analysis (pdf)
- Appx-N---Trip-Generation-and-VMT-Screening-Analysis (pdf)
- Appx-O---AB-52-Consultation (pdf)
- Appx-P---LHMWD-Will-Serve-Letter (pdf)
STETSON CORNER (CUP19-009, SDR19-010, TPM37779)
- Final Environmental Impact Report (FEIR) (pdf)
- Appendix A - NOP_Initial Study_Public Comments (pdf)
- Appendix B - Lighting Plan and Photometric Analysis (pdf)
- Appendix C - AQ-GHG_Tech Report (pdf)
- Appendix D - Biology Letter Report (pdf)
- Appendix E - Cultural Resources Report (pdf)
- Appendix F - Geotech Letter Report (pdf)
- Appendix G - Geotechnical Investigation (pdf)
- Appendix H - Phase I_Retail 3145 (pdf)
- Appendix I - Phase I_Retail 3255 (pdf)
- Appendix J - Noise Study (pdf)
- Appendix K - Traffic Impact Analysis (pdf)
- Appendix L.1 - WQMP (pdf)
- Appendix L.2 - WQMP (pdf)
- Appendix M.1 - Drainage Study (pdf)
- Appendix M.2 - Drainage Study (pdf)
- Appendix N - Public Service Coordination (pdf)
- Appendix O - Energy Section Calculations (pdf)
- Appendix P - Acoustical Analysis (pdf)
- Appendix Q - SCAQMD Air Quality Significance Thresholds (pdf)
- CEQA Findings of Fact (pdf)
- Mitigation Monitoring & Reporting Program (MMRP) (pdf)
- Appendices (pdf)
S2A MODULAR HOME FACTORY (CUP19-004, SDR19-004)
- Draft Initial Study
- Notice of Availability and Notice of Intent
- Appendix A
- Appendix B-1
- Appendix B-2
- Appendix C
- Appendix D-1
- Appendix D-2
- Appendix D-3
- Appendix D-4
- Appendix D-5
- Appendix E
- Appendix F-1
- Appendix F-2
- Appendix F-3
RANCHO DIAMANTE
- Draft SEIR (PDF)
- MMRP Rancho Diamante Phase II SPA
- Notice of Availability Draft SEIR
- Proposed Amendment for Specific Plan PCD19-93
River Oaks Ranch - TTM 36889, TTM 36890
- Notice of Hearing & Notice of Intent (PDF)
- Initial Study (PDF)
- Mitigation Monitoring & Reporting Program (PDF)
Starbucks at Page Plaza - Conditional Use Permit Number 18-006
Shop N Go - Tentative Parcel Map Number 37564, Conditional Use Permit Number 16-008 and Variance Number 18-001
BNR Income
Zanderson Plaza
Downtown Specific Plan